REQUEST FOR QUOTATION (RFQ) SUMMARY
Shefah Group
Website: Shefah.com
Tel: (407) 633-7736
PROJECT: CLASS 5 CREW CAB TRUCK WITH DUMP BED AND CRANE
Shefah Group is requesting quotations from qualified suppliers for the procurement of a Class 5 Crew Cab Truck with Dump Bed and Crane. Below is a summary of the primary requirements and specifications.
PRODUCT REQUIREMENTS:
- Vehicle Type: Class 5 Crew Cab Truck
- GVWR: Minimum 19,000 lbs
- Engine: Diesel, 350 HP, 700 lb-ft torque minimum
- Transmission: Automatic, electronically controlled, with PTO provision
- Drive: Four-wheel drive
- Wheelbase: To meet bodybuilder requirements
- Battery: Dual 1500 CCA combined minimum
- Alternator: 200A
- Cab Features: Air conditioning, cruise control, AM/FM stereo with hands-free phone interface, factory tinted glass, base vinyl interior, front and rear bench seats, insulated vinyl floor covering, factory upfitter switches
- Wheels & Tires: Steel wheels, all-terrain tires, painted white/gray/silver
- Cab Color: White
DUMP BODY & CRANE REQUIREMENTS:
- Dump Bed: 10 – 12′ heavy-duty dump bed
- Floor: 3/16” steel
- Sides: 24” 10-gauge, boxed top rail, permanent left side, right-side drop-down
- Tailgate: 2-piece barn-door style, removable
- Headboard: 42” 10-gauge
- Additional Features: Tool rack, locking toolboxes (2), wheel chock holders, fold-away steps, rear mud flaps, horizontal cone rack, rear tow hitch receiver (Class 4)
- Crane: Fold-away knuckleboom crane, 28,000 ft-lbs lifting moment minimum, 2,000 lbs capacity minimum, 19’8” reach minimum, mounted between cab and dump bed, corded remote, outriggers
- Lighting & Safety: LED strobes (5 locations), backup alarm, factory switch-wired PTO
- Inspection: Must meet NC state inspection requirements
- Keys/Fobs: 3 sets required
DELIVERY & TIMELINE:
- Delivery Location: Shefah Group, NC. USA Exact Address TBD
- Price Quote Deadline: March 9th
PURPOSE OF USE:
The vehicle will be used for heavy-duty commercial operations, including material transport, lifting, and field servicing. The truck must meet all applicable OSHA and FMVSS standards to ensure reliability and safety.
BID SUBMISSION:
- Required Documents: Checklist of technical specifications that are different from above, warranty details, and pricing
- Deadline: March 10th
- Contact for Questions: Josh (407) 633-7736
USE THIS CHECKLIST
Thank you,
Cell: 407.633.7736
Josh@shefahgroup.com
Shefah Group
Sample Photos




